COOK COUNTY AIRPORT, GEORGIA
This project consisted of two 7,800 s.f. box hangars with hydraulic doors and two 12,480 s.f. T-hangars with sliding doors. Major work elements included steel building design (PEMB), slab design, associated sitework, paving, and utilities (potable water and electric).
Project Cost: $1,100,000 Project Size: 40,560 SF Completion: October 2014
Owner: Cook County, Georgia BOCC Architect: C.D.M. Smith