top of page

SHELTAIR FBO TERMINAL AND AIRCRAFT HANGAR

The LEED Certified FBO Terminal building was constructed using insulated concrete forms (ICF) for perimeter walls. Interior walls were constructed using light gauge metal studs and drywall.

The PEMB hangar was supplied by Dean Steel Buildings and included a 120’ plane access hangar door. Eave height is 35’ and total clear span of 175’.

Project Cost: $1,797,320     Project Size: 5,500 SF FBO & 10,500 SF Hangar     Completion: February 2003

Owner: Sheltair Panama City     Architect: Kenneth R. Carlson Architect

bottom of page