We believe our true measure of success is a satisfied client. That is why we believe that "Every project is a self portrait of those who built it. Therefore we should autograph our work with quality and integrity.
From the RAM Development Team:
TALON TRAINING RANGE
This project was designed to be of low environmental impact and included grading an access road and installing a vehicular bridge across a FDOT maintained ditch. Expansive sitework was done in constructing the the compacted earthen fill ranges, with stabilized and vegetated berms. The buildings constructed are connected by wood walkways. Water and sewer utilities are provided by wet well and septic tank systems. A storm water system with retention area was constructed. The wetlands surrounding the area were protected.
Project Cost: $582,105 Project Size: 24 acres Completion: July 2013
Owner: St. Joe Commercial Architect: In-House Design