LEON HIGH SCHOOL
Our team excelled on Leon High School’s campus through the new construction, renovation/remodel, and site improvement projects phased over the nine years (2003 - 2012) we worked on this site. We performed work throughout the campus, which included gym renovations, a historic window restoration, new doors/frames/hardware, new casework, flooring, painting, acoustical ceilings, specialties, new plumbing piping/fixtures, HVAC equipment, new electrical systems/fixtures, low voltage systems and fire alarm systems. We renovated the rigging system for the Graphic Arts Center stage and installed new lighting and A/V equipment. We expanded the cafeteria, replaced the HVAC system and the chiller. We also built a Rifle Range for the Jr. ROTC. Many of these projects were done while the building was occupied. Our time at Leon High School was extremely rewarding for our team and we believe these improvements highlight the amazing work done at this school by the students and staff.
Total Project Cost: $8,484,444 Project Size: +/- 107,000 SF Owner: Leon County Schools
Architects/Engineers: Barkley Consulting Engineers; DAG Architects, Inc.; David H. Melvin, Inc.;
Johnson & Peterson Architects; Leon County Schools, McGinniss & Fleming Engineering, Inc.;
MLD Architects, Inc.; St. Joe Commercial Inc.