In 2005, a dining area improvement included a new 60 linear feet metal stud and drywall separation wall. Two ADA compatible doors were installed as well as a new HVAC unit, due to the size of previously utilized units. This project also included installation of VCT flooring and acoustical ceiling tiles.


In 2008, a 15,000 SF metal warehouse addition consisted of steel framing, metal roof and walls, storage shelving, shipping areas, HVAC installation, and concrete floors and support for structural work. 

Total Project Cost: $605,216     Project Size: 15,000 SF     Completion: December 2008

Owner: RJR, LLC     Architect: Barkley Consulting Engineers

RAM Construction & Development, LLC

20 RAM Blvd. Midway, FL 32343

Ph: 850.671.7267     Fax: 850.671.2773