BUSBY DEPOT/FRITO LAY WAREHOUSE

 COTTONDALE, FLORIDA

This 60’ X 110’ Pre-Engineered Metal Building included a 30” high concrete slab on the front of the building for route truck loading, a canopy over the personnel door, hollow metal doors with galvanized steel frames and a vision window for the interior door from the office area into the warehouse.

Total Project Cost: $376,772     Project Size: 6,600 SF     Completion: October 2016

Owner: Busby Cottondale, LLC     Architect: Kenneth A. Sweeney